The brick patio was designed 9 years ago (June 2008). The wood beams have been replaced and reclaimed bricks added. Next weekend it’ll be pressure washed with polymeric sand swept into the joints. Also, the river rocks around the stepping stones will be cemented in place and leveled.
Blog Activity Calendar