River Rock Walkway, 2017

It’s amazing that a year has gone by since I last worked with cement and river rocks.

https://lovecreekfarm.com/2016/12/29/river-rock-walkway/

Having a few weeks vacation and no rain makes the perfect combination for working on this project.  Hopefully, 2017 will be the year that the River Rock Pathway is finally done!

Yesterday, 12/26/17 I was able to do the first row of rocks around two planter beds.  Then, I finished 3 rows in front of the garage (7 bags of concrete mix).

This slideshow requires JavaScript.

Today, I did about 11 rows in front of the garage and added some pebbles that I bought off ebay last year (8 bags of concrete mix).

This slideshow requires JavaScript.

To Do:

  • Add more rows in front of the garage, covering the cement walkway.
  • Add a second row of rocks on the planter beds.
  • Add rocks around the stepping stones in the brick patio.
  • Design one more stepping stone.
  • Cover the whole walkway with mortar for a smooth walking surface.

 

About lovecreekfarm

2.5 acre permaculture with heritage orchard, organic gardens, redwood forest, and riparian corridor along Love Creek at the base of Ben Lomond mountain, San Lorenzo Valley, Santa Cruz County.
This entry was posted in About. Bookmark the permalink.